The project was commissioned at the end of 2019 and was realized in 3 months. The container production was carried out by the company Kustan and the assembly of all attachment components by the company UGN. It is a single biogas filter module without valve cabinet and switch cabinet (no electrical components). The filter module must be connected independently to all on-site media (heating circuit, air dosing, fresh water supply and condensate discharge). A corresponding stainless steel tube serpent and the ball valves are available. The commissioning is also carried out independently.