The commissioning of the project took place in March 2020 and was realized in 4 months. The container production and assembly of all attachment components was carried out by the company UGN. It is a single biogas filter module without valve cabinet and switch cabinet (no electrical components). The filter module must be connected independently to all on-site media (heating circuit, air dosing, fresh water supply and condensate removal). A corresponding stainless steel tube serpent and the ball valves are available. The commissioning is also carried out independently with the support of the company P.W. Thielemann GmbH.